Phase 2 Details

Phase 2 includes a full size 11v11 soccer stadium with bleachers and lights, as well as the first facility for missionary housing.  Scroll down for more.

** Update **

We have adjusted some details for missionary housing from the images below. The general idea, number of family dwellings, and corresponding cost, remain the same. See details below. 

11v11 Stadium

The centerpiece of the whole property is an outdoor, artificial turf, 11v11 stadium. In addition to being the Rhinos training facility and home field, the stadium will be a fixture location in the city of Santa Cruz for community events, weekly leagues, tournaments, camps, etc.   

Our architect and builder have advised artificial turf over natural grass based on their cost evaluation over time, water consumption, and maintenance.

The plans for the field include: 

  • Full size 11v11 turf field with goals
  • Stadium lighting
  • Access road around the field, also serving as running track
  • Stadium seating
  • Sophisticated drainage and filtration system

Cost: $368,000

2 Missionary Homes

We have made some adjustments to the original plan for missionary housing., The total cost and number of families accommodated states the same, but the separate homes gives us some flexibility on the prioritization of the builds.

Now included in the 2nd phase is two missionary homes. They are located in between the Academy/field and the front gate, on the high side of the property, allowing for the missionaries to have full range of view over the ministry.

Cost: $186,000 (93k each)

Head-start on Team-house & Staff Apartment Building

Re-organizing the construction of missionary housing allows us to get a head-start on the Team-house and Staff Housing Unit. For more information on this building, see Phase 3.

$93,000 (head-start)

Total Cost for Phase 2: $647,000 


$647,000 has been given to date!


PHASE 2 IS NOW

FULLY FUNDED!!!